Shoaiba – Mina – LINE B EPC Contractor RTCC

  • The scope of the new Shoaiba Mina Line B Water Pipeline System based in the middle east is to double the existing transport capacity towards the city of Makkah by building a second pipeline system between Shoaiba PS1 and existing Tap-off point to Arafat Tanks.
  • Shoaiba Mina Line B capacity is identical to Line A rated at 577,342 m3/day.
  • TSSE are completing design and supply of the main plant Cooling Water System working with RTCC as the main EPC Contractor.
  • Cooling water system design flow rate of 802m3/hr to provide cooling water to main and booster pump sets rated at between1.4 and 10 Mw together with Lube Oil System associated with the main pump units.
  • Main equipment supply, Primary and secondary pumps, Double Wall Plate Heat Exchangers, Pipework, Valves, Automatic Filters, MCC, Instrumentation sufficient to provide fully automatic operation and control.